Metro Reasons: JBG Smith wants to build a new Crystal City station entrance

This story originally appeared on Greater Greater Washington.
A plan submitted by developer JBG Smith to Arlington County could see the company put in charge of building the second Crystal City Metro station entrance, a long-sought-after project that would increase access to the station.
If approved, the new entrance would be built along Crystal Drive near 18th street, providing riders a quicker connection to the proposed new VRE Crystal City station and to offices and residences in the area. A copy of the submitted proposal was made available to Greater Greater Washington for review.
Read more on Greater Greater Washington.

Popular posts from this blog

Improperly-stored rail disrupts Red Line, causes single-tracking

Metro to suspend Silver Line service during summer platform shutdown

Man Hit by Orange Line Train at Dunn Loring Metro Station