Metro Reasons: JBG Smith wants to build a new Crystal City station entrance

This story originally appeared on Greater Greater Washington.
A plan submitted by developer JBG Smith to Arlington County could see the company put in charge of building the second Crystal City Metro station entrance, a long-sought-after project that would increase access to the station.
If approved, the new entrance would be built along Crystal Drive near 18th street, providing riders a quicker connection to the proposed new VRE Crystal City station and to offices and residences in the area. A copy of the submitted proposal was made available to Greater Greater Washington for review.
Read more on Greater Greater Washington.

Popular posts from this blog

Metro to suspend Silver Line service during summer platform shutdown

Improperly-stored rail disrupts Red Line, causes single-tracking

Man Hit by Orange Line Train at Dunn Loring Metro Station